A set of construction, installation and commissioning works, supply of materials and equipment for the construction of a 500 kV ZapSib substation (500/110 kV substation), 110 kV Main Step-down Substations (GPP) GPP-1, GPP-2, cable racks 110 kV (KRUE-110kV-GPP1, KRUE-110kV-GPP2) for the needs of JSC CIUS UES - CIUS Siberia within the industrial zone of OOO Tobolsk-Neftekhim.
Substation 500 kV Ochakovo (installation of shunt reactors 500 kV)
Substation 500 kV Taman
Successfully and on time, a set of works was completed to carry out construction and installation work, commissioning and supply of equipment for the construction of a 500 kV outdoor switchgear under the title "500 kV Substation Ust-Kut with overhead lines 500 kV and 220 kV" for the needs of the branch of PJSC FGC UES - MES Siberia .
Substation 500 kV Taman
Substation 500 kV Ust-Kut
A set of works on construction and installation, commissioning and supply of materials and equipment on completion of construction under the title "Comprehensive technical re-equipment and reconstruction of SS 500 kV Arzamasskaya" for the needs of the branch of OAO FGC UES - MES Volga was successfully completed and on time.
Substation 500 kV Chagino (reconstruction)
A set of works on the development of detailed design documentation, construction and installation work, commissioning and supply of materials and equipment under the title “500 kV Ochakovo Substation” was successfully completed and on time. Installation of shunt reactors 500 kV" for the needs of the branch of PJSC "FGC UES" - MES Center.
Substation 500 kV Arzamasskaya (reconstruction)