img
Substation 330 kV Petrozavodskaya (reconstruction)
Construction and installation works, commissioning, supply of material and technical resources and equipment
img
img

A set of works (delivery of materials and equipment, construction and installation work) was successfully completed and on schedule in the scope of the 1st stage of construction (reconstruction of a 330 kV outdoor switchgear at the 330 kV substation Petrozavodsk) as part of the implementation of the title "Construction of a 330 kV overhead line Ondskaya HPP - 330 kV substation Petrozavodskaya with an approximate length of 278 km" for the needs of the branch of PJSC FGC UES - MES of the North-West.

img
img
img

Substation 500 kV Arzamasskaya (reconstruction)

img

Substation 500 kV ZapSib

img
Substation 500 kV ZapSib
Customer:
Construction and installation works, Commissioning works, supply of material and technical resources and equipment
img
img

A set of construction, installation and commissioning works, supply of materials and equipment for the construction of a 500 kV ZapSib substation (500/110 kV substation), 110 kV Main Step-down Substations (GPP) GPP-1, GPP-2, cable racks 110 kV (KRUE-110kV-GPP1, KRUE-110kV-GPP2) for the needs of JSC CIUS UES - CIUS Siberia within the industrial zone of OOO Tobolsk-Neftekhim.

img
img
img

Substation 500 kV ZapSib

img

Substation 500 kV Taman

img
Substation 500 kV Taman
Customer:
Construction and installation works, Commissioning works, supply of material and technical resources and equipment
img
img

img

Substation 500 kV ZapSib

img

Substation 500 kV Ust-Kut

img
Substation 500 kV Ust-Kut
Customer:
Development of design documentation, implementation of construction and installation works, commissioning, supply of materials and equipment
img
img

Successfully and on time, a set of works was completed to carry out construction and installation work, commissioning and supply of equipment for the construction of a 500 kV outdoor switchgear under the title "500 kV Substation Ust-Kut with overhead lines 500 kV and 220 kV" for the needs of the branch of PJSC FGC UES - MES Siberia .

img
img
img

Substation 500 kV Taman

img

Substation 500 kV Chagino (reconstruction)

img
Substation 500 kV Chagino (reconstruction)
Customer:
Adjustment of design documentation, construction, commissioning, supply of of material and technical resources and equipment in the amount of 1-3 and 5 stages
img
img

img

Substation 500 kV Ust-Kut

img

Substation 500 kV Arzamasskaya (reconstruction)

img
Substation 500 kV Arzamasskaya (reconstruction)
Customer:
Development of design documentation, implementation of construction and installation works, commissioning, supply of materials and equipment
img
img

A set of works on construction and installation, commissioning and supply of materials and equipment on completion of construction under the title "Comprehensive technical re-equipment and reconstruction of SS 500 kV Arzamasskaya" for the needs of the branch of OAO FGC UES - MES Volga was successfully completed and on time.

img
img
img

Substation 500 kV Chagino (reconstruction)