img
Substation 330 kV Belgorod (reconstruction)
Development of design documentation, adjustment of project documentation, construction and installation work, commissioning, supply of materials and equipment
img
img

A set of works on the development of detailed design documentation, adjustment of design documentation, implementation of construction and installation works, commissioning and supply of materials and equipment under the title "Substation 330 kV Belgorod" for the needs of the branch of PJSC FGC UES - MES Center was successfully completed and on time.

img
img
img

Substation 500 kV Arzamasskaya (reconstruction)

img

Substation 500 kV ZapSib

img
Substation 500 kV ZapSib
Customer:
Construction and installation works, Commissioning works, supply of material and technical resources and equipment
img
img

A set of construction, installation and commissioning works, supply of materials and equipment for the construction of a 500 kV ZapSib substation (500/110 kV substation), 110 kV Main Step-down Substations (GPP) GPP-1, GPP-2, cable racks 110 kV (KRUE-110kV-GPP1, KRUE-110kV-GPP2) for the needs of JSC CIUS UES - CIUS Siberia within the industrial zone of OOO Tobolsk-Neftekhim.

img
img
img

Substation 500 kV ZapSib

img

Substation 500 kV Taman

img
Substation 500 kV Taman
Customer:
Construction and installation works, Commissioning works, supply of material and technical resources and equipment
img
img

img

Substation 500 kV ZapSib

img

Substation 500 kV Ust-Kut

img
Substation 500 kV Ust-Kut
Customer:
Development of design documentation, implementation of construction and installation works, commissioning, supply of materials and equipment
img
img

Successfully and on time, a set of works was completed to carry out construction and installation work, commissioning and supply of equipment for the construction of a 500 kV outdoor switchgear under the title "500 kV Substation Ust-Kut with overhead lines 500 kV and 220 kV" for the needs of the branch of PJSC FGC UES - MES Siberia .

img
img
img

Substation 500 kV Taman

img

Substation 500 kV Chagino (reconstruction)

img
Substation 500 kV Chagino (reconstruction)
Customer:
Adjustment of design documentation, construction, commissioning, supply of of material and technical resources and equipment in the amount of 1-3 and 5 stages
img
img

img

Substation 500 kV Ust-Kut

img

Substation 500 kV Arzamasskaya (reconstruction)

img
Substation 500 kV Arzamasskaya (reconstruction)
Customer:
Development of design documentation, implementation of construction and installation works, commissioning, supply of materials and equipment
img
img

A set of works on construction and installation, commissioning and supply of materials and equipment on completion of construction under the title "Comprehensive technical re-equipment and reconstruction of SS 500 kV Arzamasskaya" for the needs of the branch of OAO FGC UES - MES Volga was successfully completed and on time.

img
img
img

Substation 500 kV Chagino (reconstruction)