A set of works on construction and installation, commissioning and supply of materials and equipment on completion of construction under the title "Comprehensive technical re-equipment and reconstruction of SS 220 kV Borskaya" for the needs of the branch of JSC FGC UES - MES Volga was successfully completed and on time.
Substation 500 kV Arzamasskaya (reconstruction)
A set of construction, installation and commissioning works, supply of materials and equipment for the construction of a 500 kV ZapSib substation (500/110 kV substation), 110 kV Main Step-down Substations (GPP) GPP-1, GPP-2, cable racks 110 kV (KRUE-110kV-GPP1, KRUE-110kV-GPP2) for the needs of JSC CIUS UES - CIUS Siberia within the industrial zone of OOO Tobolsk-Neftekhim.
Substation 500 kV ZapSib
Substation 500 kV ZapSib
Successfully and on time, a set of works was completed to carry out construction and installation work, commissioning and supply of equipment for the construction of a 500 kV outdoor switchgear under the title "500 kV Substation Ust-Kut with overhead lines 500 kV and 220 kV" for the needs of the branch of PJSC FGC UES - MES Siberia .
Substation 500 kV Taman
Substation 500 kV Ust-Kut
A set of works on construction and installation, commissioning and supply of materials and equipment on completion of construction under the title "Comprehensive technical re-equipment and reconstruction of SS 500 kV Arzamasskaya" for the needs of the branch of OAO FGC UES - MES Volga was successfully completed and on time.
Substation 500 kV Chagino (reconstruction)