img
Newspaper «Regional»: «90 meters above the ground. Power lines were thrown over Lena» (May 2022)

25 / 05 / 2022

Mass media about us

The construction of a crossing over the Lena River is part of a project to construct a 500 kV overhead power line from the Nizhneangarskaya substation to the Ust-Kut substation with a length of about 465 km in the Irkutsk region.


Link to article

img